 This is a site meeting for a proposed robotic grazing diary unit for 180 cows, with A,B,C grazing.
Here we are reviewing the plans with a planning consultant CowPlan works with. |  This is a 300 cow unit Ivor Davey helped design in 2012. This uses C50 floor mounted cubicles with Pasture Mat mattresses complete with 20mm foam layer. The cows are perfectly positioned with clean and easy to manage beds. This unit is fully tanked. |  These are sand beds - with C50 post mounted cow cubicles. |  This is a 6 milk robot, free access unit under construction. The building will house over 400 cows including dry cows and calving areas. This is due for complete summer 2015. Ivor Davey has been key to the overall design and layout, and has worked closely with the client, robot manufacturers, construction team and farm consultant. |
|---|